In this post
A reliable structure
- Set the stage: a quick check-in so everyone speaks early.
- Gather data: what happened this Sprint, including facts such as incidents, carried-over items and cycle time.
- Generate insights: why did it happen?
- Decide what to do: one or two concrete improvements, each with an owner.
- Close: a quick check on whether the retro itself was useful.
Formats to rotate
- Start, Stop, Continue: simple and quick, good for new teams.
- Mad, Sad, Glad: brings out feelings that facts miss.
- 4Ls (Liked, Learned, Lacked, Longed for): balanced and forward-looking.
- Sailboat: wind (what helped), anchors (what slowed us), rocks (risks ahead), island (the goal).
- Timeline: plot the Sprint day by day and mark highs and lows; good after a difficult Sprint or incident.
- Five Whys: take one problem and ask why until you reach a cause you can act on.
- Data retro: start from a chart, such as cycle time or deployments, and ask what explains it.
Making actions stick
- Limit to one or two actions. Ten actions means none.
- Make each small enough to finish within the next Sprint.
- Give each a single owner.
- Put actions in the Sprint Backlog, as the 2020 Scrum Guide suggests the most impactful improvements may be.
- Start the next retro by checking the last actions.
Safety first
People only raise real problems if it is safe to do so. Keep managers out unless the team invites them, focus on systems rather than individuals, and never use retro notes against anyone. The same principle drives the blameless postmortem.
Remote retros
Use a shared board, give silent writing time before discussion so quieter people contribute, and keep cameras optional. Timebox tightly: the Guide caps the Retrospective at three hours for a one-month Sprint, and shorter Sprints usually need less.
Sources and further reading
- Schwaber, K. and Sutherland, J. (2020). The Scrum Guide. scrumguides.org.